.. index:: ! p2p_ALOS2_SCAN_Frame.csh ************************ p2p_ALOS2_SCAN_Frame.csh ************************ Synopsis -------- **p2p_ALOS2_SCAN_Frame.csh** *Master_stem Aligned_stem config.alos2.txt parallel* Description ----------- The **p2p_ALOS2_SCAN_Frame.csh** is a processing script for creating a interferogram with ALOS2 ScanSAR data. Place the IMG-files and LED-files in a directory called **raw** and a dem.grd file in a parallel directory called **topo** . Execute this command at the directory location above **raw** and **topo** . During processing, F1 - F5 and merge folder will be generated. All SLCs will be upsampled to PRF 3350 and then processed. Final results will be placed in the merge folder, with phase Required Arguments ------------------ *Master_stem* Name stem of the master or reference image *Aligned_stem* Name stem of the aligned or secondary image *config.alos2.txt* Configuration file (a default file can be generated with :doc:`pop_config.csh` ) *parallel* Chose mode 0 or 1 to run in parallel or sequentially. Parallel = 0-sequential 1-parallel Example ------- :: p2p_ALOS2_SCAN_Frame.csh IMG-HH-ALOS2234653650-180927-WBDR1.1__D IMG-HH-ALOS2236723650-181011-WBDR1.1__D config.alos2.txt 1